Are you guys looking for Civil Engineering MCQ Questions with Answers PDF Free Download as per Civil Engineering new exam pattern? You came to the right page. This may assist you to understand and check your knowledge about the Subjects. Students also can take a free test of the Multiple Choice Questions of Civil Engineering. Each question has four options followed by the right answer. These Civil Engineering MCQ Questions are selected supported by the newest exam pattern.
Q1. In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to
(A) 15 mm
(B) 25 mm
(C) 35 mm
(D) 45 mm
Answer: (B) 25 mm
Q2. The art of bringing the floor to a true level surface by means of screeds, is called
(A) Topping
(B) Bedding
(C) Screeding
(D) None of these
Answer: (C) Screeding
Q3. The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is
(A) Mortise and tenon joint
(B) Oblique mortise and tenon joint
(C) Butt joint
(D) Mitred joint
Answer: (B) Oblique mortise and tenon joint
Q4. In clay soil
(A) Swelling and shrinkage characteristics prevail
(B) Consolidation continues even after several years of construction
(C) Differential settlement is generally prevalent
(D) All the above
Answer: (D) All the above
Q5. In soft clay of low bearing capacity, the type of steel pile generally used, is
(A) H-pile
(B) Screw pile
(C) Disc pile
(D) Pipe pile
Answer: (B) Screw pile
Q6. The type of roof suitable in plains where rainfall is meagre and temperature is high is
(A) Pitched and sloping roof
(B) Flat roof
(C) Shell roof
(D) None of the above
Answer: (B) Flat roof
Q7. During percussion drilling
(A) Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
(B) Caving or mixing of strata are caused in soft soils or cohesion-less soils
(C) The soil to a considerable depth below the bottom of the hole gets disturbed
(D) All the above
Answer: (D) All the above
Q8. Which one of the following activities is not correct as applicable to brick corbels
(A) The maximum projection of the corbel should not be more than the thickness of the wall
(B) The maximum projection of each corbel course should be limited to a quarter brick at a time
(C) The discontinuous corbels are used to carry heavy concentrated loads
(D) Stretcher bond is generally used for the construction of brick corbel
Answer: (D) Stretcher bond is generally used for the construction of brick corbel
Q9. Gravels
(A) Are cohesionless aggregates
(B) Vary in size between 2 to 20 mm
(C) Never swell when they come into contact with water
(D) All the above
Answer: (D) All the above
Q10. For constructing a terrazzo floor, Pick up the incorrect statement from the following:
(A) A base course is prepared as in cement concrete flooring
(B) A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
(C) Glass strips are driven into the layer according to the pattern required
(D) After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material
Answer: (B) A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
Q11. The type of stone masonry in which stones of same height are laid in layers, is called
(A) Random rubble masonry
(B) Course rubble masonry
(C) Uncoursed rubble masonry
(D) Ashlar masonry
Answer: (B) Course rubble masonry
Q12. In ordinary residential and public buildings, the damp proof course is generally provided at
(A) Ground level
(B) Plinth level
(C) Water table level
(D) Midway ground level and water-table level
Answer: (B) Plinth level
Q13. The differential settlement in case of foundations on sandy soils should not exceed
(A) 25 mm
(B) 40 mm
(C) 65 mm
(D) 100 mm
Answer: (A) 25 mm
Q14. The arrangement made to support an unsafe structure temporarily, is known as
(A) Shoring
(B) Scaffolding
(C) Underpinning
(D) Jacking
Answer: (A) Shoring
Q15. An arch constructed with finely dressed stones, is known
(A) Ashlar arch
(B) Rubble arch
(C) Gauged arch
(D) Axed arch
Answer: (A) Ashlar arch
Building Construction MCQ SET wise with Answers
- Building Construction MCQ SET-1
- Building Construction MCQ SET-2
- Building Construction MCQ SET-3
- Building Construction MCQ SET-4
- Building Construction MCQ SET-5
- Building Construction MCQ SET-6
- Building Construction MCQ SET-7
- Building Construction MCQ SET-8
- Building Construction MCQ SET-9
- Building Construction MCQ SET-10
- Building Construction MCQ SET-11
- Building Construction MCQ SET-12
- Building Construction MCQ SET-13
- Building Construction MCQ SET-14
- Building Construction MCQ SET-15
- Building Construction MCQ SET-16
- Building Construction MCQ SET-17
- Building Construction MCQ SET-18
- Building Construction MCQ SET-19
We hope the given Civil Engineering MCQ Questions with Answers will definitely yield fruitful results. Hope you got enough ideas on the MCQs on Civil Engineering. If you have any queries related to Civil Engineering MCQs Multiple Choice Questions with Answers, drop your questions below and will get back to you in no time.